The Director General of the Crimea Development Corporation Daniil Pidaev announced this on the air of the program «Lines» of the Radio "Crimea".
"It is planned to expand the existing territory of the state industrial park "Dzhankoy" to accommodate an agro-industrial park on it.
In general, this will be a powerful boost for the northern part of the peninsula," Daniil Pidaev said.
He recalled that the industrial park provides for the placement of not one industrial production, but a whole production complex, which will be able to accumulate on one territory due to the existing engineering infrastructure. In addition, these productions will be able to complement each other if necessary.
"These will be productions that will be built around the anchor, the main resident of the park. I think that it will be determined in the near future," Daniil Pidaev said.
The Director General noted that in the northern part of the Crimea, the city of Dzhankoy should become a growth point in the near future for the revival and development of the industrial potential of the republic.
The territory of the Dzhankoy Machine-Building Factory for the creation of the first state industrial park was not chosen by chance. This enterprise with more than a century of history has an extensive network of buildings, structures, areas where production of any complexity can be located. The company produced agricultural machinery products. It has not been working since the mid-2000s.
The total area is about 26 hectares. The territory is located in an industrial zone, with existing access roads, including railway ones.